2341926-2ozone converter
How these numbers are calculated
Ranges use at least three eligible quotes from at least three independent suppliers.
Median $37,000. Range $18,000 to $51,000 across 3 supplier quotes, condition New.
How these numbers are calculated
Ranges use at least three eligible quotes from at least three independent suppliers.
Median $26,000. Range $18,000 to $40,000 across 9 supplier quotes, condition Overhauled.
How these numbers are calculated
Ranges use at least three eligible quotes from at least three independent suppliers.
Median $32,000. Range $18,000 to $34,000 across 3 supplier quotes, condition Serviceable.
- Requested, last 12 months
- 1×
- Typical lead time
- 0–11 days
- Quotes observed
- 15
What 2341926-2 is
2341926-2 is an ozone converter. The buyer who requested it wrote "NGS OZONE CONVERTER". That single description is the whole of our identity evidence: no NSN, no DLA catalogue record, and nothing we would publish from a parts catalogue. A parts catalogue names a manufacturer and an airframe for this number. That source has attributed parts to companies that did not build them, so neither appears here.
Need several parts? Send them as one RFQ instead of one form at a time.
Condition guidance for 2341926-2
Three conditions are published, and every band here was observed inside a window of a few days. Serviceable's median sits above overhauled's, which is the reverse of the usual order. Across a window this narrow that is a fact about those days, not a market signal, and we will not offer a reason for it we cannot evidence. Overhauled draws on 9 quotes, of which 2 were written for more than one unit, leaving 7 observed at quantity one. In this sample the quantity-one overhauled quotes clustered lower than the multi-unit ones. Every figure is a per-unit price, and the records do not establish that quantity caused the difference or that the pattern would repeat. New is the thinnest band on this page, and the numbers behind it should be read before the price is. It rests on 3 quotes from 3 suppliers, of which 2 were written for more than one unit. That leaves 1 observed at quantity one. Our records do not establish that quantity caused the differences between those quotes, and one part's sample is not a pricing rule. Read the new band as a dated observation of what those suppliers wrote inside that window. It is not a planning range and not a forecast, and nothing on this page supports a statement about where this price goes next. The observation dates are printed with the band itself. Of the three, overhauled has the most evidence behind it: 9 quotes from 8 suppliers, against new's 3 from 3. That is a statement about sample size and nothing else. It is not a recommendation, not a price anyone has offered to hold, and not a substitute for a current quote on the condition you actually need.
15 quotes stated a lead time, the median was 0 days and the 75th percentile 11 days. 8 recorded a lead time of 0 days. 1 RFQ line from 1 RFQ, not flagged AOG. That request produced quote observations concentrated inside the short windows above.
Frequently asked
We do not know, and on this evidence the question may not have an answer worth having. All three bands come from the same few days of quoting, so the ordering reflects who answered then. Ask each supplier what work their unit has had rather than reading the condition labels as a price ladder.
Overhauled: 7 of 9, with 2 written for more than one unit. New: 1 of 3. In this sample the quantity-one overhauled quotes clustered lower than the multi-unit ones. Our records do not establish that quantity caused that, and one part's sample is not a pricing rule. Every figure is a per-unit price. Ask for a price at the quantity you actually need rather than reading it off the median.
That every figure here is a snapshot of a few days rather than a trend. Nothing on this page supports a statement about whether prices are rising or falling, and we have not made one. Treat the bands as a dated record of what was quoted, not as a range to plan or budget against.
15 quotes stated a lead time, with a median of 0 days and a 75th percentile of 11 days. 8 recorded 0 days.
Prices are aggregated from quotes our sourcing desk requested from suppliers — never a single supplier’s price. Each is parsed automatically and spot-checked by a human when we quote it to a buyer; not every quote in this range has had that second look. Our methodology explains how we check them. Generated 2026-09-20 · Reviewed by Austin Stout · September 2026. Have a correction? Email hello@honest.aero.