2116M25P01HPC rear (CDP) seal
What buyers wrote when requesting this part — not an effectivity determination. Confirm applicability against your own approved data.
Supplier quote history · limited sample
- Overhauled
- 6 supplier quotes · 4 independent suppliers · Sep 2026
Our desk already holds supplier quotes for 2116M25P01. Request a quote and we will source current pricing for you.
We publish a price range once a condition has 6 usable quotes from 5 independent suppliers, so this page shows counts, not prices. These are historical quotes received against real requests, not offers to sell.
- Requested, last 12 months
- 2×
- Typical lead time
- 0–45 days
- Quotes, all conditions
- 7
Free. No account, no obligation. We’ll come back to you either way, usually within 2 business days and faster on AOG.
What 2116M25P01 is
2116M25P01 is a part buyers have described on RFQs as an HPC Rear (CDP) seal. It has been named on RFQs associated with CFM56 engines. No DLA FLIS item name or NSN exists for this part number, and no manufacturer is verified in the evidence we have.
Need several parts? Send them as one RFQ instead of one form at a time.
Condition guidance for 2116M25P01
This page does not publish a price for any condition. The best-supported condition, overhauled, has 6 supplier quotes from 4 independent suppliers recorded between September 27 and September 30, 2026, which is below the depth we require before publishing a median and range. A new condition quote exists but comes from a single supplier, so it is withheld entirely.
Across all conditions, 7 usable quotes stated a lead time: the median was 21 days, with a quarter at 0 days and a quarter at 45 days or more. 3 quotes recorded a lead time of 0 days, which reflects what was logged on those quotes, not confirmed stock. The part has been requested on 2 RFQ lines across 2 RFQs, both in the last 12 months, with no AOG requests recorded.
Frequently asked
We don't publish a price for this part yet. The overhauled condition has only 6 quotes from 4 suppliers, below the sample size we require before showing a median and range.
We don't know. Some quotes recorded a lead time of 0 days, but that's a recorded duration on a quote, not a confirmation of inventory on hand.
No manufacturer is verified in our evidence for this part number. We don't name one without verification.
None are recorded. There is no DLA PUB LOG cross-reference for this part number, so we have nothing to report on alternates.
Across 7 quotes that stated a lead time, the median was 21 days. A quarter of quotes recorded 0 days and a quarter recorded 45 days or more.
The quote counts above come from quotes our sourcing desk requested from suppliers. Each is parsed automatically and spot-checked by a human when we quote it to a buyer; not every quote counted here has had that second look. Our methodology explains how we check them. Generated 2026-10-28 · Published under a sampled batch review, not individually reviewed · October 2026. Have a correction? Email hello@honest.aero.